Quantity Takeoff
A structured quantity schedule, organized around the trade you are bidding.
Introductory single-trade takeoff: from $125 · USD / project. See offer terms, comparisons & inclusions →
What the scope can include
- Lengths, areas and counts measured from calibrated drawings.
- Sheet and drawing revision references retained with takeoffs.
- Trade-organized Excel workbook for contractor review.
- Scope clarifications, assumptions and exclusions recorded.
START WITH THE SCOPEBring us the drawings.
Request a project quoteBring us the drawings.
We’ll define the next step.
Tell us the trade, project location and deadline. A written scope and fee come before any work begins.