Every line.
Accounted
for.
Turn construction drawings into a scope you can see, quantities you can trace, and an estimate your team can review.
From lines
to line items.
Illustrative report structure · quantities require measurement.
A number.
With a basis.
Illustrative cost structure · no market rates assumed.
Single-trade takeoffs from $125.
First 5 paid projects or 60 days from launch. Scope review applies. Offer started 8 November 2026.Your bid needs more
than a final number.
It needs the drawing behind it. The scope included. The assumptions made. And a clear view of what still needs an answer.
We prepare project-based takeoffs and cost estimates for contractor review—with those details in the work.
Quantity
takeoff.
You have the rates.
Start with a clear quantity schedule.
- Areas, lengths & counts
- Trade & drawing references
- Assumptions & exclusions
Cost
estimating.
Go from measured scope
to a documented cost build-up.
- Material, labor & equipment
- Location & pricing-date basis
- Explicit indirect allowances
The right trades.
The right boundaries.
Every project starts with an agreed list of included work. Explore typical scope considerations below.
Inside every finish.
Flooring, drywall, painting, ceilings and openings. Confirm finish schedules, heights, substrate preparation, deductions and the current drawing revision.
Included trades are confirmed in your written quotation.Built to be
opened.
Not just sent.
Editable Excel detail. A clear PDF summary. Drawing references, rate sources and exclusions your team can actually review.
Explore the sample deliverables ↗estimate.ILLUSTRATIVE / PDF
In context.ILLUSTRATIVE / XLSX
Clear at every step.
- 01
Share the scope.
Drawings, trades, location and your target deadline.
- 02
Approve the brief.
Written scope, fee and delivery date before work begins.
- 03
Review the work.
Human quantity and pricing QC before final release.
Send the plans.
Start with clarity.
A defined scope. A written fee.
A human-reviewed deliverable.